|
Clearbrook Waterworks Districs
Groundwater Management and Protection
GW Solutions is advising the board of directors of the Clearbrook Waterworks District about the operation of their water supply system.
The CWD delivers an average 4000 m3/day of non-treated drinking water originating from a shallow confined aquifer. GW Solutions is providing reports and tools describing and explaining the source of the water, the operation of the wells, the daily cost of extraction of the groundwater, the quality of the water, and the risks of deterioration of the water quality. The directors of the CWD now have the tools to better understand and monitor their water system, and are in a better position to make decisions to meet present and future water demands.
Report describing the regional and local hydrogeology, and the wells and their operation (2.6MB, PDF)
Water Quality Assessment Report (9.7MB, PDF)
Well Rehabilitation and Development Report (2.1MB, PDF)
Survey of Existing and Abandoned Wells (7.3MB, PDF)
Water Demand Assessment 2009 (7.5MB, PDF)
CWD Operations in 2008 (4.4MB, PDF)

Figure 4: Pitless adapter on top of riser pipe

Figure 5: Camera inspection of well prior to rehabilitation
|