|
Other Consulting Projects
Review of the design of a large production well for a municipality
Figure 15: Drilling of a large diameter (60 cm) municipal production well
Completion of pumping tests and water sampling

Figure 16: Residential well being tested for both its discharge rate and the quality of its water
Design of an alternative water supply for a public water purveyor having issues with turbidity of its existing water supply

Figure 17: Sign recommending water users to boil their water due to high turbidity
|